Morse-Mink Geotechnical Investigation

New Albany has initiated a geotechnical investigation in preparation for the Morse-Mink Express Sewer project. The geotechnical investigation will primarily consist of soil borings and rock cores used to determine a preferred alignment of the sewer, as well as determine suitable access shaft locations. Phase one of the investigation will occur October 2024 through March 2025. Additional investigation is anticipated but not scheduled.

The photos depict boring rigs used for the geotechnical investigation.

The investigation corridor is shown below in purple. Download the investigation corridor PDF.

geotechnical investigation corridor